How to scope a corporate AV quote without missing the obvious
Most missed scope on corporate events is not exotic. It is power, rigging, load-in and internet. Here is a repeatable order for scoping a room.
By Duncan Underwood · · 7 minute read
The expensive mistakes on corporate AV quotes are rarely about choosing the wrong fixture. They are about a detail that nobody wrote down: a ceiling with no rigging points, a loading dock booked until ten, an internet connection that turns out to be one shared line for the whole building.
A brief that gets scoped in a consistent order surfaces those details before the quote is sent. This is the order we find works, starting from the room rather than from the equipment list.
Start with the room, not the gear
Write down every space the client mentioned, even the ones that sound like corridors. Rooms drive quantities: microphones per room, screens per room, operators per room. A two-room event with a shared catering area is three spaces, and the shared area often needs audio.
- Room name, capacity and what happens in it
- Whether the room is used once or repeatedly across days
- Whether it is shared with another event before or after
- Where the audience enters and where the presenter stands
Interrogate the venue
The venue is the single largest source of variation. A room that looks simple can need three extra hours of load-in, a lift booking, or a temporary power run. Confirm these details rather than inferring them from photos.
- Access windows for load-in and bump out, in writing
- Air freight or goods lift availability and booking process
- Power: outlets, phases, total available draw and where the distribution point sits
- Rigging: points, safe working load, whether a rigger is mandatory
- Internet: measured upload speed, not a promise of high speed
- Noise restrictions, curfew and amplified sound limits
Then build the audio chain
For each room, work out how the sound gets in and how it gets out. Presenter microphones, playback, a mixing position, foldback if anyone on stage needs to hear, recording or streaming feeds, and a way to hand audio to the venue if they are using their own system.
This is where quantity errors creep in. A panel session with six presenters needs six microphones, not the two that were listed. Quote the quantity the format requires, and note the format in the quote so the client understands why.
Vision and content
Ask what the audience must see. One confident slide deck per room is a different scope to switching between a laptop, a wireless presenter, a video call and a live camera. Where content is coming from an external source, name the source and the connection method, and quote the converter or interface hardware that makes it work.
Lighting is more than fixtures
General wash, key light on the presenter, and anything the camera needs are three separate requirements. Camera work changes lighting because a face that reads well to the eye can be uneven on a recording. Quote control and rigging as part of the lighting scope, not as an afterthought.
Crew and time
Crew is where a quote either holds or quietly leaks. Split setup, operating and bump out into separate lines with real units. A four-hour session can easily sit inside a ten-hour day once setup and pack down are included, and that difference belongs in the price.
- Setup days or hours, with a defined call time
- Operating hours, including any early start for rehearsals
- Bump out, and whether the venue charges for out-of-hours access
- Travel and accommodation for crew, if the site is not local
Logistics and exclusions
Trucking, parking, permits, freight and rubbish removal all cost money and are all usually missing from a first draft. Write exclusions in plain language as well: if power is the venue's responsibility, say so in the quote rather than in a conversation nobody recorded.
Review before it leaves
Before sending, read the quote against the brief room by room. Every room should have a set of line items, every day should have crew, and every unmatched or estimated item should carry a note. That review pass takes ten minutes and catches most of the mistakes that turn into variation claims later.
Related reading
- Why quotes lose money in the gap between the brief and the estimate
The commercial losses on event work cluster in a few predictable places. None of them are about the equipment list.
Questions about this article? Email hello@myevent-labs.io.